[00]   Canonical Labs · Groundwork

What data centers are actually permitted in your county.

There is a great deal of noise about data centers right now and very little that anyone can check. Groundwork reads the permits. For every county it tracks, it publishes what operators have actually filed with the regulator — how many sites, how many backup generators, how much they are permitted to emit — each figure sourced to the filing it came from. No press releases, and no panic.

Sites tracked503
Issued permits201
Coverage39 states · 131 counties
UpdatedAugust 21, 2026
What the filings add up to, once somebody adds them up.
70vs 2
Permits just under the line. 70 Virginia data center permits are written for 90–99.99 tons of NOx a year. Only 2 reach 100 — the threshold that triggers major-source review.
11,633
Permitted backup generators. Counted from the text of individually unremarkable permits. No single filing discloses this total.
5,882
In Loudoun County alone. The densest county on record, and the reason the aggregate matters more than any one permit.
503
Sites tracked, in 39 states. 247 read permit-by-permit in Virginia; 253 from EPA's national registry.

Start with where you live.

Read the map as a floor, not a census. Coverage is uneven by design of the source, not by design of ours: air permitting is a state function, so there is no national permit list. The national layer is EPA's registry, where the industry code is self-reported — which is why Texas shows only 61 facilities here despite being one of the largest data center markets in the country. An empty county means nobody has filed under a code we can see, never that nothing is there.

Of the 412 sites located precisely enough to check, 16 sit inside a FEMA Special Flood Hazard Area and 176 draw from basins WRI rates high or extremely high for water stress. Virginia — the densest cluster on the map — has zero in a flood zone; its exposure is water.

County — click to zoom in Site — verified location In a FEMA flood zone
Zoom in or search to see sites

91 of 503 tracked sites have no verified coordinate and are deliberately absent from the map — placing them on a county centroid would imply a precision the permit does not support. They are all reachable through the search box above and through the county tables below.

The aggregate nobody else discloses.

Permit-by-permit, a data center build-out looks routine. County-by-county, it looks like this. These totals exist only because someone added up hundreds of separately-published filings. Generator counts appear only for Virginia, where Groundwork reads the permit documents themselves.

LocalitySitesPermitsGenerators permittedIn flood zone
Loudoun County85925,882
Fairfax County31351,757
Prince William County28292,058
Cook County25
Douglas County20
Bexar County1542
Fulton County15
Dallas County11192
Maricopa County11
Mecklenburg County101116
Henrico County88248
DuPage County7
Tarrant County68
Middlesex County62
Montgomery County6
Sarpy County61
Collin County519
Harris County5111
Arapahoe County5
Johnson County5

The 20 densest of 131 counties. A dash in the permits or generators column means Groundwork has the facility from EPA's registry but has not yet read that state's permit documents — not that the facility is unpermitted.

Every county tracked

Loudoun County 85 Fairfax County 31 Prince William County 28 Cook County 25 Douglas County 20 Bexar County 15 Fulton County 15 Dallas County 11 Maricopa County 11 Mecklenburg County 10 Henrico County 8 DuPage County 7 Tarrant County 6 Middlesex County 6 Montgomery County 6 Sarpy County 6 Collin County 5 Harris County 5 Arapahoe County 5 Johnson County 5 Denver County 5 Hudson County 5 El Paso County 5 Fauquier County 4 Culpeper County 4 Manassas City 4 Denton County 4 Philadelphia County 4 Anne Arundel County 4 Catawba County 4 Dakota County 4 Clark County 4 Allegheny County 4 Medina County 3 Travis County 3 Ellis County 3 Williamson County 3 Newton County 3 Laramie County 3 Boulder County 3 Undetermined County 3 Spotsylvania County 2 Chesterfield County 2 Stafford County 2 Frederick County 2 Wise County 2 Essex County 2 St. Joseph County 2 Bucks County 2 Franklin County 2 Boone County 2 Warren County 2 Hennepin County 2 Hillsborough County 2 Adams County 2 Cass County 2 Jefferson County 2 Grant County 2 Oklahoma County 2 Northampton County 2 Santa Clara County 2 Bernalillo County 2 Worcester County 2 Polk County 2 Rockland County 2 Caroline County 1 Louisa County 1 Hanover County 1 Caldwell County 1 Freestone County 1 Floyd County 1 Shackelford County 1 Bosque County 1 Virginia Beach City 1 Harrisonburg City 1 Russell County 1 Ogle County 1 Madison County 1 Umatilla County 1 Forsyth County 1 Washoe County 1 Summit County 1 Passaic County 1 Shelby County 1 Orange County 1 Kane County 1 Pottawattamie County 1 Tulsa County 1 Davidson County 1 Marshall County 1 Henry County 1 Kendall County 1 Ramsey County 1 Rockingham County 1 Richland County 1 Salt Lake County 1 Broomfield County 1 York County 1 Fayette County 1 Columbiana County 1 Storey County 1 Lehigh County 1 Pepin County 1 McDonald County 1 Benton County 1 Union County 1 Delaware County 1 Grafton County 1 Wake County 1 Somerset County 1 Sacramento County 1 Hartford County 1 Jackson County 1 Kingfisher County 1 Gwinnett County 1 Kootenai County 1 Minnehaha County 1 New York County 1 Mayes County 1 Kalamazoo County 1 Bay County 1 Nassau County 1 Linn County 1 Gordon County 1 Bristol County 1 Rockdale County 1 Lake County 1 Mercer County 1 Rhea County 1 Taylor County 1 Alameda County 1

Permits stop just short of the line.

Virginia air permits tabulate how much nitrogen oxide a facility may emit each year. At 100 tons a year a new source becomes a major source, which brings a stricter review and a public participation process. Of the 155 data center permits where that figure is readable, here is where they land.

Under 25 48
25 – 50 13
50 – 75 13
75 – 90 9
90 – 99.99 70
100 and over 2

Tons of NOx per year permitted, per facility. Read from the emissions table of each permit and labelled probable — a figure parsed from a PDF, and a permitted ceiling rather than measured emissions.

What this is not

It is not evidence of wrongdoing. Designing a facility to stay under a regulatory threshold is lawful, ordinary engineering, and every industry does it. These are also backup generators — permitted to run during outages and for testing, typically tens of hours a year.

Groundwork takes no view on any individual application, and does not claim any single permit was sized to avoid scrutiny.

What it does show

The distribution is not what engineering need alone would produce. 70 permits land in the last ten tons below the line; 2 cross it. A threshold that was incidental would not bend the curve this hard.

Whatever else is true, the review process that 100 tons is meant to trigger is being triggered 2 times, in the densest data center market on earth.

Which facts you can lean on.

There is no blended score. A single number would hide which inputs came from a filing and which came from a fuzzy match, and that difference is the product.

TierMeansSource
confirmedRead straight from a filing, or an exact point-in-polygon lookupState air permits · EPA registry · FEMA NFHL · WRI Aqueduct
probableMatched on a non-unique key. Very likely right, not certainAddresses and emissions read from permit PDFs
reportedEstablished by journalism, no filing yet. Upgrades automaticallyNamed publication, per entry
pendingNot collected yet. Never a claim that nothing is there

How this is built, and where it is weak.

Sources

Limits

  • A floor, not a census. Permitting is a state function. Depth varies by what each state publishes — every county page says which.
  • Virginia is deepest by accident of disclosure, not importance. It is the only state with a data-center-specific permit list.
  • Permits are ceilings, not measurements, and approval is not construction.
  • 91 sites have no verified coordinate and are off the map by choice. A county centroid would imply precision the filing does not support.
  • 610 facilities were excluded — they carry the data-processing industry code but nothing identifies them as data centers.

Spotted an error?

Fuzzy-matched fields are labelled as such and some will be wrong. Open an issue — corrections are tracked in public and noted on the page.

Groundwork compiles US public disclosures. Not investment advice, not a flood model, and not a substitute for a site-specific engineering or insurance assessment. Confidence tiers describe how a fact was established, not how severe a risk is. Download the dataset.