Stargate Abilene

Taylor County, TX

OperatorOpenAI / SoftBank / Oracle / MGX consortium
Permits0
Generators permitted
Latest permit—

What the disclosures say.

Each layer below carries its own confidence tier and its own citation. There is deliberately no blended risk score: a single number would hide which parts are read from a filing and which are inferred.

Air permitpending
Permit held; count not published by this source

Latest issued n/a. . Issued by —.

No permit located, published as of
Flood zonepending
Awaiting disclosure

No confirmed street address, so no FEMA point-in-polygon lookup has been run. This page upgrades automatically once a permit or address appears.

No citation — this layer is unresolved for this site.
Water stresspending
Awaiting disclosure

No confirmed coordinate, so no Aqueduct basin lookup has been run.

No citation — this layer is unresolved for this site.
Grid interconnectionpending
Not yet matched

No interconnection match attempted for a site without a disclosure record.

No citation — PJM retired its public bulk queue download; this layer awaits a Data Miner feed.
Locationpending
Taylor County, VA (locality only)

No street address established.

No permit located (locality column)
Operatorreported
OpenAI / SoftBank / Oracle / MGX consortium

Attributed by press coverage, not by a permit of record.

Permittee of record:
Permitted equipmentpending
Not stated in readable permit text

No permit to read.

Read from the text of 0 permit documents listed below

Where this site sits in the build.

Proposed
Filed
Approved
Under construction
Operational

Stage as described in press coverage: Under construction. Not established by a filing. reported

What the operator says

No public operator statements have been recorded for this site. Company claims about capacity, cooling technology and water use are kept in this block, separate from the verified record above, and are never merged into it.

Every dated event on the record.

  • January 1, 2026

    Campus permitted for 62 diesel generators and 10 gas turbines

    Floodlight (citation pending verification) reported

  • January 1, 2026

    Campus permitted for 62 diesel generators and 10 gas turbines

    Floodlight reported

Every permit behind this record.

RegistrationIssuedProgramDocument

Spotted an error?

Fuzzy-matched fields are labelled as such and some will be wrong. Open an issue — corrections are tracked in public and noted on the page.